Archaeology along the Thameslink route
PCA and Oxford Archaeology (OAPCA) were commissioned to undertake the archaeological work for the Thameslink and London Bridge Station infrastructure upgrade as a joint venture.
The project included the construction of a new viaduct through Borough Market, across Borough High Street and through to the rebuilt London Bridge Station.
OAPCA has produced a four-volume monograph series presenting the archaeological results of the project. All four volumes have now been published, with details below.



